Loft Conversion Volume: How to Check the 40 or 50 Cubic Metre Limit

The 40 and 50 cubic metre loft limits explained: what counts, why end-of-terraces get 40, how dormer and hip-to-gable volumes are worked out, and common errors.

If you’re planning a dormer or hip-to-gable loft conversion under permitted development, one number decides whether you need a planning application: the extra roof volume. For a terraced house the limit is 40 cubic metres; for a semi-detached or detached house it’s 50. Get the sum wrong, or forget something that counts, and a scheme you thought was permitted development may need planning permission after all.

This guide explains what the rule actually says, how designers usually work the volume out, and the mistakes that most often push a London loft over the limit.

What the rule says

Class B of the permitted development rules (GPDO 2015, Schedule 2, Part 1) covers additions and alterations to the roof. Paragraph B.1(d) says it isn’t permitted development if the cubic content of the resulting roof space exceeds the cubic content of the original roof space by more than 40 cubic metres for a terrace house, or 50 cubic metres in any other case.

Three definitions do most of the work:

  • “Resulting roof space” means the roof space as enlarged, taking into account any enlargement to the original roof space, whether permitted development or not (B.3).
  • “Original” means the house as it stood on 1 July 1948, or as built if it’s newer.
  • “Cubic content” is measured externally (article 2 of the Order). So the figure is based on outside dimensions, not the room you’ll end up with inside.

Which limit applies to your house?

The Order defines a terrace house as one in a row of three or more houses that shares a party wall, or has a main wall adjoining, with the house on either side. It also covers the house at the end of the row, as long as it’s attached to one that meets that test. So an end-of-terrace house gets 40 cubic metres, not 50, even though it only has one neighbour. Only one of a pair (semi-detached) or a detached house gets 50.

What counts towards the allowance

  • Dormers of any shape, including the part over a rear outrigger in an L-shaped dormer.
  • Hip-to-gable infill, where a sloping hipped end is built up into a vertical gable.
  • Earlier roof enlargements. The government’s technical guidance says any previous enlargement to the original roof space in any part of the house must be included. The Planning Portal warns that a previous owner may have done this even if you haven’t.

Rooflights that sit close to the roof slope don’t add roof space. They fall under Class C, which has its own limits: no more than 0.15 metres proud of the original roof slope, no higher than the highest part of the original roof, and side-facing roof windows obscure-glazed and non-opening below 1.7 metres above the floor.

How the volume is usually worked out

Neither the Order nor the technical guidance sets out a calculation method, so designers use plain geometry on measured drawings, with external dimensions. The two most common shapes are below. The numbers are illustrative only, not from a real house.

A flat-roofed box dormer

Seen from the side, the new space is a right-angled triangle: the dormer face is one side, the flat roof is the other, and the old roof slope is the long side. Run that triangle along the width of the dormer and you get:

Volume = ½ × projection × face height × width

Example: a dormer 5.0m wide, projecting 3.0m back from its face to where its roof meets the slope, with a face 2.4m high, adds ½ × 3.0 × 2.4 × 5.0 = 18 cubic metres. A common mistake is to multiply the full box (36 cubic metres here), which counts roof space that was already there and doubles the figure.

A hip-to-gable

The infill between the old hip slope and the new gable wall is a pyramid shape. Its base is the new gable triangle and its height is the horizontal run of the hip:

Volume = ⅓ × (½ × roof depth × ridge height) × hip run

Example: a roof 8.0m deep from front eaves to back eaves, a ridge 3.0m above the eaves and a hip running 4.0m in from the end wall gives ⅓ × 12 × 4.0 = 16 cubic metres.

Together, that hip-to-gable and rear dormer come to 34 cubic metres: inside the 50 cubic metre limit for a semi, with 16 to spare. Real roofs are rarely that neat (hips can stop short, ridges can be lower at the back), so use the architect’s measured figures, not a rough sketch.

Mistakes that push a scheme over the limit

  • Using internal dimensions. Cubic content is measured externally, so roof build-up and wall thickness count.
  • Assuming an end-of-terrace gets 50. It gets 40.
  • Forgetting an older dormer or rear roof addition added by a previous owner.
  • Adding an outrigger dormer late. An L-shaped dormer on a Victorian terrace uses the allowance on both roofs.
  • Checking the volume and nothing else. Class B also fails if the work goes higher than the highest part of the existing roof, extends beyond a roof slope on the principal elevation that fronts a highway, includes a balcony, or is on article 2(3) land such as a conservation area. Conditions include similar-looking materials, keeping the dormer at least 0.2 metres back from the eaves (so far as practicable, except hip-to-gables and roofs joined to an extension) and obscure-glazed side windows.
  • Missing an Article 4 direction. Some London streets have removed roof permitted development rights; see our guide to Article 4 directions.

If the design is over the limit

You have three realistic options: shrink the dormer (less width or projection), drop one element such as the outrigger dormer, or apply for planning permission for the scheme you actually want. Our comparison of dormer, hip-to-gable and mansard lofts helps you weigh the space each gives. Whichever route you take, a lawful development certificate from the council is the way to get certainty that permitted development work is lawful before you build, and the technical guidance recommends asking the council where there’s any doubt.

Remember that permitted development only deals with planning. Building regulations approval is still needed for structure, fire safety, stairs and insulation; see why a loft conversion needs building regs approval.

Frequently asked questions

Is the 40 or 50 cubic metre limit measured internally or externally?

Externally. The GPDO defines cubic content as measured externally, so use outside dimensions.

Does an end-of-terrace house get 50 cubic metres?

No. Under the GPDO definition, a house at the end of a row of three or more counts as a terrace house, so the limit is 40 cubic metres.

Do rooflights count towards the loft conversion volume?

Rooflights that follow the roof slope don’t add roof space. They’re covered by Class C, which limits how far they can project (0.15 metres) and how high they can go.

Does an old dormer count towards my allowance?

Yes. Any earlier enlargement of the original roof space counts, whoever built it and whether or not it was permitted development.

Planning a loft conversion and not sure about the volume?

We’ll measure the roof, check the volume and the other permitted development limits, and tell you whether you need a planning application before you commit. See our loft conversion service in London, request a quote and project review, call 020 7971 1318 or message us on WhatsApp.

General information only. Sources checked on 23 November 2026.