Health & Safety Policy

Home » Health & Safety Policy

HEALTH AND SAFETY POLICY

Fixiz Ltd — Company No: 14561967

FX-HSP-001  |  Revision 2  |  Version: October 2026

Policy Start Date (original issue): 12 December 2025  |  Next Review Date: October 2027

1. Statement of Intent

Fixiz Ltd is committed to ensuring, so far as is reasonably practicable, the health, safety, and welfare of all employees, contractors, clients, and members of the public who may be affected by our operations.

We recognise our duties under the Health and Safety at Work etc. Act 1974 and associated regulations and will:

  • Provide safe systems of work and a safe working environment
  • Identify hazards and reduce risks through effective risk management
  • Ensure safe use, handling, storage, and transport of equipment and materials
  • Provide adequate training, instruction, supervision, and information
  • Consult with employees on health and safety matters
  • Prevent accidents, work-related ill health, and dangerous occurrences
  • Continuously improve our health and safety performance

Senior management is fully committed to this policy and will allocate sufficient resources to implement it effectively.

2. Organisation and Responsibilities

2.1 Director Responsibilities (Managing Director)

The Director of Fixiz Ltd holds overall responsibility for health and safety and will:

  • Ensure compliance with all relevant UK health and safety legislation
  • Establish and maintain effective health and safety management systems
  • Ensure risk assessments and method statements (RAMS) are produced and implemented
  • Provide adequate resources (time, personnel, financial)
  • Appoint competent persons where required
  • Review health and safety performance annually
  • Ensure accident reporting and investigation procedures are followed

2.2 Managers / Supervisors

Managers and supervisors will:

  • Implement this policy on site and in operations
  • Ensure all works are carried out in accordance with RAMS
  • Conduct site inspections and safety checks
  • Stop unsafe work where necessary
  • Ensure operatives are competent and trained
  • Monitor use of PPE and safety equipment
  • Report and investigate accidents, incidents, and near misses

2.3 Employees and Operatives

All employees have a legal duty to:

  • Take reasonable care of their own health and safety and others affected by their work
  • Follow company procedures, RAMS, and instructions
  • Use equipment and PPE correctly
  • Report hazards, defects, and incidents immediately
  • Not misuse or interfere with safety equipment

2.4 Contractors

Fixiz Ltd will:

  • Ensure contractors are competent and adequately insured
  • Provide relevant health and safety information
  • Monitor contractor performance
  • Require contractors to comply with this policy and relevant legislation

2.5 Appointed Persons

The Director will appoint competent persons for the roles below and will keep this table up to date when appointments change.

RoleAppointed personNotes
Director (overall responsibility for health and safety)Javier Vazquez
Competent Health and Safety AdvisorJavier Vazquez, Director, Fixiz LtdAppointed as a competent person under regulation 7 of the Management of Health and Safety at Work Regulations 1999.
First Aider(s)Iris Medina (part-time)
Fire Marshal / Appointed PersonDavid Chojnowski on the site where he is working; Javier Vazquez on all other sitesSee 3.9.1.

3. Arrangements

3.1 Risk Assessments

  • Suitable and sufficient risk assessments will be carried out for all work activities
  • Control measures will follow the hierarchy of control
  • RAMS will be communicated to all operatives before work starts
  • Assessments will be reviewed regularly or when changes occur

3.2 Safe Systems of Work

  • All high-risk activities (e.g., work at height, electrical work, lifting operations) will be planned and controlled
  • Permits to work will be used where necessary
  • Work will be supervised appropriately

3.3 Training and Competence

  • All employees will receive appropriate training, including induction training, task-specific training, and toolbox talks
  • Records of training will be maintained
  • Only competent persons will undertake specialist work

3.4 Work Equipment (PUWER)

  • All equipment will be suitable for its intended use, maintained in safe condition, and inspected regularly
  • Users will be trained and authorised

3.5 Personal Protective Equipment (PPE)

  • PPE will be provided where risks cannot be adequately controlled by other means
  • PPE will be suitable, maintained, and worn as required
  • Typical PPE may include: helmets, gloves, eye protection, hi-vis, safety footwear

3.6 Work at Height

  • Work at height will be avoided where possible
  • Where unavoidable: proper access equipment (e.g., scaffold, MEWP) will be used; ladders used only for short-duration, low-risk work; edge protection and fall prevention systems implemented

3.7 Electrical Safety

  • All electrical systems will comply with the Electricity at Work Regulations 1989
  • Equipment will be tested (PAT where applicable)
  • Only competent persons will carry out electrical work
  • Live working will be avoided unless absolutely necessary

3.8 Hazardous Substances (COSHH)

  • COSHH assessments will be carried out
  • Exposure will be prevented or controlled
  • Suitable storage and handling arrangements will be implemented
  • Safety Data Sheets (SDS) will be available

3.9 Fire Safety

  • Fire risk assessments will be undertaken
  • Adequate fire detection and extinguishing equipment provided
  • Clear emergency procedures and evacuation routes maintained
  • Staff will receive fire safety training

3.9.1 Fire Marshal

The fire marshal on a site is David Chojnowski when he is working on that site. On all other sites the fire marshal is Javier Vazquez.

That person will:

  • Check that escape routes are kept clear before work starts
  • Tell everyone on site, and the occupier, the way out and the assembly point outside the property
  • Keep a fire extinguisher suitable for the work in the van or on site
  • Control hot works and ignition sources
  • Keep waste and combustibles to a minimum
  • If there is a fire, raise the alarm, evacuate everyone, call 999, do a head count at the assembly point, and not re-enter

Longer or larger projects (for example, commercial fit-outs) will have a project-specific fire risk assessment.

3.10 Accident Reporting (RIDDOR)

  • All accidents, incidents, and near misses will be recorded
  • Reportable incidents will be notified in accordance with RIDDOR 2013
  • Investigations will identify root causes and prevent recurrence

3.11 Welfare Facilities

  • Suitable welfare facilities will be provided in accordance with regulations, including toilets, washing facilities, drinking water, and rest areas

3.12 Monitoring and Review

  • Regular inspections and audits will be carried out
  • Performance will be reviewed annually
  • Policy will be updated as required

3.13 Asbestos

In accordance with the Control of Asbestos Regulations 2012, Fixiz Ltd will:

  • Obtain or commission a suitable refurbishment and demolition (R&D) survey before any intrusive work is carried out in buildings where asbestos-containing materials may be present
  • Not start intrusive work until the survey findings have been reviewed and any required controls are in place
  • Stop work immediately if suspected asbestos-containing materials are discovered, prevent access to the area, and report the finding to the Director or the person in charge of the work
  • Ensure that licensed asbestos work is carried out only by a contractor licensed by the Health and Safety Executive
  • Ensure that any non-licensed asbestos work is carried out only by trained, competent persons in accordance with the Control of Asbestos Regulations 2012
  • Provide relevant asbestos information, including survey findings, to those who may be affected

3.14 Construction (Design and Management) Regulations 2015 (CDM 2015)

Fixiz Ltd will discharge the duties of Principal Contractor or Contractor, as applicable to each project, under the Construction (Design and Management) Regulations 2015.

Where Fixiz Ltd is appointed as Principal Contractor, it will:

  • Prepare and implement a Construction Phase Plan before construction work begins
  • Plan, manage and monitor the construction phase so that it is carried out without risks to health and safety, so far as is reasonably practicable
  • Provide suitable welfare facilities for the duration of the construction work

Where Fixiz Ltd is appointed as a Contractor, it will:

  • Plan, manage and monitor its work so that it is carried out without risks to health and safety, so far as is reasonably practicable
  • Provide relevant information to the client or Principal Contractor as required

Where a project is notifiable under CDM 2015, Fixiz Ltd will ensure that an F10 notification is submitted to the Health and Safety Executive before construction work begins, either by the client or, where agreed, on the client’s behalf. Construction work on a notifiable project will not start until the notification has been made.

3.15 Dust and Silica

Exposure to construction dust, including respirable crystalline silica (RCS), will be prevented or adequately controlled in accordance with the Control of Substances Hazardous to Health Regulations 2002 (COSHH). Control measures will include, as appropriate:

  • On-tool extraction, or water suppression, when cutting, grinding, drilling or chasing materials that generate dust
  • Respiratory protective equipment (RPE) to a minimum of FFP3 where residual risk remains
  • Face-fit testing for tight-fitting RPE, with operatives clean-shaven where a tight-fitting mask is required
  • Housekeeping methods that avoid dry sweeping of dust where reasonably practicable

3.16 Noise and Vibration

Fixiz Ltd will manage exposure to noise and to hand-arm vibration in accordance with the Control of Noise at Work Regulations 2005 and the Control of Vibration at Work Regulations 2005.

  • Noise exposure will be assessed and controlled, taking account of the lower exposure action value (80 dB(A)), the upper exposure action value (85 dB(A)), and the exposure limit value (87 dB(A))
  • Hearing protection will be provided and worn where required
  • Exposure to hand-arm vibration will be assessed and controlled, taking account of the daily exposure action value (2.5 m/s² A(8)) and the exposure limit value (5.0 m/s² A(8))
  • Tools and work methods will be selected to reduce vibration exposure so far as is reasonably practicable
  • Health surveillance will be arranged where required, including for hand-arm vibration syndrome (HAVS) where the exposure action value is likely to be exceeded

3.17 Manual Handling

In accordance with the Manual Handling Operations Regulations 1992 (as amended), Fixiz Ltd will:

  • Avoid hazardous manual handling operations so far as is reasonably practicable
  • Assess those operations that cannot be avoided
  • Reduce the risk of injury so far as is reasonably practicable, including by the use of mechanical aids, team lifts, and training
  • Provide information and training on safe lifting and handling techniques

4. Consultation and Communication

Fixiz Ltd will:

  • Consult employees on health and safety matters
  • Provide clear communication of risks and controls
  • Encourage reporting of hazards and suggestions

5. Emergency Procedures

  • Emergency arrangements will be established for all sites
  • First aid provision will be available
  • Emergency contacts will be displayed
  • Staff will be trained in emergency procedures

6. Signature

This Health and Safety Policy is approved and endorsed by senior management.

Name: Javier Vazquez

Director, Fixiz Ltd

Date: 22 November 2026

Document number / revision: FX-HSP-001 Revision 2

7. Review

This policy will be reviewed annually or sooner if:

  • There are significant changes in operations
  • New legislation is introduced
  • Following an incident or enforcement action

Next Review Date: October 2027

8. Related Policies

This Health and Safety Policy should be read in conjunction with the following Fixiz Ltd policies, as published at fixiz.co.uk:

PolicyPublished at
Fire Safety Policyhttps://fixiz.co.uk/fire-safety-policy/
Lone Working Policyhttps://fixiz.co.uk/lone-working-policy/
Drugs & Alcohol Policyhttps://fixiz.co.uk/drugs-alcohol-policy/
Environmental Policyhttps://fixiz.co.uk/environmental-policy/
Vehicle & Plant Safety Policyhttps://fixiz.co.uk/vehicle-plant-safety-policy/
Mental Health & Wellbeing Policyhttps://fixiz.co.uk/mental-health-wellbeing-policy/
Anti-Bribery & Corruption Policyhttps://fixiz.co.uk/anti-bribery-corruption-policy/

NOTE: This policy should be read in conjunction with project-specific Risk Assessments and Method Statements (RAMS) and communicated to all staff and contractors.